· Thirty years experience in local government, water and wastewater facility engineering, operations,
and capital improvement planning · Registered Professional Engineer · Certified operator of water and wastewater
systems Classifications WAO and SAO · Effective in communicating with board members, attorneys, financial consultants,
contractors, developers, government agencies and the public
PROFESSIONAL EXPERIENCE
MERCURI AND ASSOCIATES,
INC., Southampton, PA February 2006
Principal Engineer responsible for: · Supervision and management
of engineering staff · Design of water supply and wastewater treatment systems · Overall management of engineering
projects · Interaction with the firm's municipal clients concerning water and wastewater projects including, but no
limited to, financial analysis and capital improvements. WARMINSTER MUNICIPAL AUTHORITY, Warminster, PA 1983
to 2006
Staff Engineer whose functions were to: · Assist the General Manager with daily administration
of the Authority · Participate in management
of the Authority’s operating budget, planning and implementation of capital improvements · Review and assist with services
performed by the Authority’s consulting engineer and solicitor · Supervise construction performed by contractors for
the Authority and developers · Review land development plans for proposed construction of water and/or sewer main extensions
and new service facilities · Perform general engineering evaluations, investigations, studies, and functions
MC TISH, KUNKEL, AND ASSOCIATES, Allentown, PA 1982 to 1983
Project Engineer with consulting
engineering and surveying firm · Provided a wide range of services to governmental and private clients · Prepared
facilities plans and consulting engineer’s reports on sewerage system operations and maintenance · Updated standard
construction specifications for water and sewer systems
SPOTTS, STEVENS, AND MC COY, INC., Wyomissing, PA 1978
to 1982
Project Engineer with consulting engineering firm · Planned, designed and monitored construction of
wastewater collection system additions and pumping station renovations · Prepared applications and module forms necessary
to procure Federal and State permits · Developed and successfully implemented a sewer rehabilitation program · Represented
the firm to four municipal clients
A. L. WIESENBERGER ASSOCIATES, INC., Allentown, PA 1975 to 1978
Design
Engineer with architectural and consulting engineering firm · Represented the firm to three municipal authorities
· Designed water distribution and sanitary sewer systems · Prepared contract documents and feasibility studies
EDUCATION
VIRGINIA POLYTECHNIC INSTITUTE, Blacksburg, VA AWWA Water Utility Management
Institute – 1998 UNIVERSITY OF MAINE, Orono, ME B.S. Degree in Civil Engineering
–1975 PROFESSIONAL MEMBERSHIPS · American Water Works Association · Pennsylvania Water Environment
Association · Eastern Pennsylvania Water Pollution Control Operators Assoc., Inc. · Water Works Operators Association
of Pennsylvania
G. Carson Freeman, P. E.
SIGNIFICANT PROJECTS DURING PROFESSIONAL CAREER
WARMINSTER
TOWNSHIP MUNICIPAL AUTHORITY, Bucks County, PA Planned and implemented numerous capital improvement projects
over 23 years, including: · Expansion of wastewater treatment plant from 4.58 to 8.18 mgd, and upgrading to
meet stream discharge limits for phosphorus and total nitrogen, and installation of ultraviolet disinfection. · Construction
of entirely new 1.2 mgd sequencing batch reactor process WWTP at site of the former Naval Air Warfare Center in Warminster. · Alteration
and expansion of ten (10) sewage pumping stations. · Developed, permitted and constructed four (4) new ground water
supply wells. · Addition of aeration stripping towers for volatile organic chemical (VOC) removal at four (4) wells. · Dismantling
obsolete water storage tanks and construction of two (2) welded steel waterspheroids with capacities of 0.5 mg and 0.75 mg. · Repair,
improve, clean and paint various water storage tanks. · Water transmission mains to provide adequate flow capacity
to service new development. · Booster pumping stations to supply and maintain pressure for domestic water and fire
protection needs. · Automation of water system operations through computerized supervisory control and data acquisition
(SCADA). · Water meter replacement program with automated reading.
BOROUGH OF KUTZTOWN, Berks County, PA · Designed
improvements to interceptor sewers and obtained construction permits. · Budget preparation for water and sewer departments.
WEST
LEBANON TOWNSHIP, Lebanon County, PA · Completed sewage facilities planning report, documented needs and obtained Federal
and State grants for design and construction of wastewater collection system.
NORTH COVENTRY TOWNSHIP MUNICIPAL AUTHORITY, AND
ST. LAWRENCE BOROUGH MUNICIPAL AUTHORITY, Berks County, PA · Performed infiltration/inflow studies, developed and
implemented repair and rehabilitation program.
WEISSPORT MUNICIPAL AUTHORITY, Carbon County, PA · Design of
wastewater collection system in Weissport Borough, pumping station and force main for conveyance to Lehighton Borough WWTP. · Managed
construction, planned and implemented project financing. · Participated in inter-municipal agreement negotiations.
COPLAY-WHITEHALL
SEWER AUTHORITY AND WHITEHALL TOWNSHIP WATER AUTHORITY, Lehigh County, PA · Consulting engineer and client representative. · Performed
engineering studies and planned capital improvements to wastewater collection and water distribution systems.
BOROUGH
OF COOPERSBURG, Lehigh County, PA · Evaluated water distribution system hydraulics and identified deficiencies. · Planned
improvements to water supply, storage and distribution facilities.
PLAINFIELD TOWNSHIP, Northampton County, PA · Prepared
Act 537 Sewage Facilities Plan, including needs and feasibility analyses.
SUMMARY OF MANAGEMENT EXPERIENCE
· General
oversight of water and sewer operations and maintenance personnel. · Supervision of various professional
consultants and contractors providing services to the Authority. · Operational budget preparation, tracking
income and expenses. · Planning and implementation of financing for capital improvements. · Evaluation of water
and sewer rates and tapping fee study. · Interaction with Board Members, local elected officials, government